Heavy Industry Alloy Steel Master Link Assembly for Chain Sling

Estándar: g80
Material: acero al carbono
Tratamiento De Superficies: polvo revestido, galv. eléctrico
nombre del producto: a345 enlace maestro
tamaño: 3/4"~3-1/8"
certificados: iso9001, ce, bv

Products Details

Información Básica.

No. de Modelo.
A-345
proceso
tratamiento térmico+tratamiento superficial
grado
G80/100
moq
1pc
operación
unión occidental, t/t
plazo de comercialización
fob, cf, cif
wll
4.7t-80t
plazo de entrega
dentro de los 10 días hábiles después de recibir el depósito
aplicación
eslingas de la cadena de elevación, eslingas de cincha
muestra
disponible
envío
por mar, aire o expreso
tipo de negocio
fabricante y exportador
color
rojo/amarillo
Paquete de Transporte
Carton Packing, Then in Pallets.
Especificación
Alloy steel
Marca Comercial
First rigging
Origen
China
Código del HS
73269090
Capacidad de Producción
150 Tons/Month

Descripción de Producto

   Alloy Steel Master Link Assembly for Chain Sling 

PRODUCT DESCRIPTION

The Master Link Assembly consists of a main ring, two or more sub-rings, in which the main ring is fully forged, the sub-ring is welded, and the material is Alloy steel. The specification is 1-100 tons,and the safety factor is 4 times.

It is mainly used to assemble the spreader. The sub-ring is connected with the Link Chain and the chain connection, and is assembled into a synthetic rigging for lifting heavy objects and equipment.

It can be used for machinery,industries.

The product has passed the environmental management system certification, and can handle the product certification of well-known classification societies such as CCS, LR, DNV, etc.
The product has high strength, light weight, exquisite design, strong versatility, diverse functions, and convenient safety inspection

Heavy Industry Alloy Steel Master Link Assembly for Chain Sling

Heavy Industry Alloy Steel Master Link Assembly for Chain Sling
Product introduction

Material

Corbon steel;Alloy steel;stainless steel

Size

Different size available

Surface

Polished or zinc plated or nickel or chromed or self-color

Usage

marine, bag or pet accessories etc.

MOQ

100pcs

Capacity

100000pcs/Month

Package

clean poly bags in cartons and then on pallets or as customer requirements

Sample time

7 Work days

Lead time

10-30 Work days based on the order quantity.

Payment Terms

30% deposit in advance, 70% before shipment

 

Heavy Industry Alloy Steel Master Link Assembly for Chain Sling
Master link assembly.
The master link assembly (Master link forged) is manufactured by forging and welding.

Minimum breaking load is 4 times the W.L.L
This is the picture of G80 master link assembly.
Adopt high-quality structural alloy steel as raw material.
Heavy Industry Alloy Steel Master Link Assembly for Chain Sling
Heavy Industry Alloy Steel Master Link Assembly for Chain Sling
Heavy Industry Alloy Steel Master Link Assembly for Chain Sling



Certifications

Heavy Industry Alloy Steel Master Link Assembly for Chain Sling
Heavy Industry Alloy Steel Master Link Assembly for Chain Sling





About us:
1.Nearly 20 years experience in production
2.Owned factory, with superior quality and competitive price
3.Has a professional technical R & D team, integrating R & D, production and sales
4.The product has passed the environmental management system certification

5.ODM,OEM service is available


Heavy Industry Alloy Steel Master Link Assembly for Chain Sling

Company profile

Founded in 1998, Weifang Fuster Rigging Co., Ltd., formerly known as Changle Chain Factory, is located in Changle County of Shandong Province known as "The Gem City of China", and specializes in producing and marketing chain and rigging related products at home and abroad.

Our company has independent import and export operating rights, and can handle the certifications of CCS, LR, DNV and other famous classification societies for products. Our products are sold to dozens of countries such as Europe, America and Middle East as well as more than ten provincial and municipal regions in China, and are widely applied to the fields of ships, steel, petrochemical industry, coal mine, etc.

In the principle of "Quality-honoring & Promise-keeping", our company meets the requirements of all the customers through service innovation, changes the original production state through technical innovation, improves the product quality through process innovation, and continuously goes to standardization, elaboration, process and scientification through the business thought of constant innovation.

Absolute sincerity will move a heart of stone. Our company is willing to cooperate with domestic and foreign new/old customers in utmost sincerity, to create a common future!
Heavy Industry Alloy Steel Master Link Assembly for Chain Sling
Our services
1. Reply you inquiry with 24 hours.
2.Quality: Good quality control for each product, test reports provided on request.

3. Price: Offer the lowest ex-factory prices with a wide range of shipping ways.
4. Certification: ISO, CE Certificated, product quality strictly controlled by QC depart.

5. Provide counter sample with 2-3 weeks according to your samples, drawing or design
6. Samples are free of charge
Heavy Industry Alloy Steel Master Link Assembly for Chain Sling


Heavy Industry Alloy Steel Master Link Assembly for Chain Sling
FAQ
1.Q: What are your advantages in all these manufacturers?
A: We have a target that we will supply you products and service of high quality and reasonable price.

2.Q: How long is your delivery time?
A: According to the quantity and products you order, normally 5~30days, Generally it is 5~10 days if the goods are in stock.

3.Q: What is your terms of payment ?

A: Payment≤1000USD, 100% T/T in advance. Payment>1000USD, 30% T/T in advance ,balance before shipment. Irrepealably L/C at sight.

4.Q: Do you offer free samples?

A: We can provide you with free samples if the value is not too high, but you need to pay the freight charge.

5.Q: How can you guarantee the quality of the products we order?

A: We have matching test machines and can do the test for all of the products you order, and we can provide you with the quality certificate.

6.Q: Can we have a visit to your factory?

A: Welcome to our factory, and we will arrange the pick-up.


 


 
 

Contáctenos

No dude en enviarnos su consulta en el siguiente formulario. Le responderemos en 24 horas.